Content plan — the field notes

  • Planned series: a short sequence on non-contact level, one note per failure mode, each linked to the packages it changes.
  • Planned topics: electromagnetic against clamp-on ultrasonic on a lined pipe; what a district meter’s nightly minimum actually shows; drift on a pressure transmitter in a sludge line.
  • Per note: a photograph of the measuring point and the readings recorded during commissioning, so each claim on the page can be checked.