WW-SL
Sludge Transfer and Blanket Level
Sludge transfer flow and blanket level in settling tanks, where coating and low velocity defeat clean-liquid instruments.
- Category
- Sludge & Slurry
- Standard lead time
- 7 working days for standard models; a sludge-blanket installation check adds 3 working days.
- Package
- 3 recommended instruments
Tell us the measurement point
Medium, pipe or tank size, the output your control system expects — we reply with the principle and the model.